<legend id="h4sia"></legend><samp id="h4sia"></samp>
<sup id="h4sia"></sup>
<mark id="h4sia"><del id="h4sia"></del></mark>

<p id="h4sia"><td id="h4sia"></td></p><track id="h4sia"></track>

<delect id="h4sia"></delect>
  • <input id="h4sia"><address id="h4sia"></address>

    <menuitem id="h4sia"></menuitem>

    1. <blockquote id="h4sia"><rt id="h4sia"></rt></blockquote>
      <wbr id="h4sia">
    2. <meter id="h4sia"></meter>

      <th id="h4sia"><center id="h4sia"><delect id="h4sia"></delect></center></th>
    3. <dl id="h4sia"></dl>
    4. <rp id="h4sia"><option id="h4sia"></option></rp>

        Key Project Construction Drives Innovation, Quality Improvement of Modern Metropolitan Area of Changchun City

        Updated : 2021-12-29Source : CCFAO
        【Fonts: A+ A A- Print

        Since the 13th Party Congress, the CPC Changchun Municipal Committee and the People’s Government of Changchun City have taken active measures to ensure investment, project construction and capital funds in the face of the perplexing and changing international situation and the down turning economic pressure so as to fulfil the role of a pillar to promote the construction of the modern metropolitan area of Changchun City. 

        Over the past five years, more than 3,600 projects invested with more than RMB50 million each have been started, and a total of some RMB1 trillion has been invested. These projects, especially the strategic projects, have effectively reinforced the strength, explored the potential and strengthened the power of the modern metropolitan area of Changchun, thereby becoming a main motor of power source driving the all-round, comprehensive revitalization of Jilin Province. 

        From April 2020 to June 2021, a super smart factory called Fanrong of Hongqi for the implementation of the new energy strategy of the 14th Five-Year Plan was made a reality. 

        This factory invested with nearly RMB8 billion for a standard production capacity of 240,000 vehicles a year has started mass production of E-QM5 and other models of Hongqi. It is becoming a new “source of power” for the revitalization of FAW’s independent brands and a new point of support for Changchun International Automobile Town to become a cluster at a trillion level for automobile industry. 

        The factory Fanrong of Hongqi is one of a series of major industrial projects fully implemented for the real economy of the city after the 13th Party Congress. 

        Audi Q Factory, Aerospace Information Industrial Park, Yatai Pharmaceutical Industrial Park, FAW Hongqi Fanrong Factory, Changchun International Film Capital, Changde Intelligent Equipment Industrial Park... Within five years, 1,700 key industrial projects were started, constructed and put into operation as early as expected, which in turn have made the local real economy bigger, stronger and better, and meanwhile effectively promoted the transformation of economic growth supported by primary industry to one driven by diversification. The ratio of the primary, the secondary and the tertiary industry has experienced a historic leap from “2 to 3 to 1” to “3 to 2 to 1”. 

        In May this year, the Chang Guang Satellite Technology Co., Ltd., the only one of its kind in Northeast China, appeared on the list of Unicorn Enterprises 2020.

        365账号无法登陆_best365官网苹果下载_365bet取款要多久

         

        The Chang Guang Satellite Technology Co., Ltd. is a typical establishment of the transformation of Changchun’s advantages in science and education into innovative advantages. Due to the efforts made by all involved in the province, the major sci-tech achievements of Changchun Institute of Optics and Precision Machinery and Physics, Chinese Academy of Sciences, were transformed in the city, leading to the founding of the first commercial remote sensing satellite company in China. Since the 13th Party Congress, 21 Jilin-1 satellites have been put on orbit, becoming the largest matrix of commercial remote sensing satellites in China. The Aerospace Information Industrial Park based on Chang Guang went operational in October 2018. A cluster covering the whole industrial chain and with satellite R&D and production as the core is becoming the city’s innovation card.

        365账号无法登陆_best365官网苹果下载_365bet取款要多久

         

        Changchun, a famous city of science and education ranking among the top scientific research cities for years, has not only contributed wisdom to national innovation and development, but also attracted a large number of sci-tech innovation projects. 

        Over the past five years, 300 major sci-tech innovation projects such as Inspur Northeast Asian Cloud Data Center, Huawei Research Institute, FAW Volkswagen New Technology Development Center, FAW R&D Institute’s New Energy ICV Innovation and Test Center, large aperture space optical load comprehensive ring model test platform have got settled in Changchun, which in turn has improved the sci-tech innovation ability and strengthened the development momentum of the city. 

        With the opening of the extension line of Qianjin Street, the Yongchun Plate has once again become the focus of the public-only 10 minutes from Jinyu Road to China Railway Expo City and less than 30 minutes to Yijiatun at the junction of Changchun and Yitong. 

        This 37.056km-long road with 8 lanes in two directions has improved to a great extent the capacity of the city to drive the development of the southern city proper. 

        Moreover, since the 13th Party Congress, more than 400 major infrastructure construction projects characterized by “internal acceleration and external extension” have been implemented under the background of new infrastructure construction of the country for the goal of the modern metropolitan area of Changchun City. 

        Within the built-up area, such projects as reconstruction and upgrading of Renmin Street, two horizontal and three vertical expressways, rail transit phases II and III have been taken as the key point for the improvement in urban traffic efficiency, the effective treatment on “diseases of city”. The mileage of rail transit has gone up to 100.1km, and the commuter efficiency has been improved remarkably.  

        Inside the hinterland of the metropolitan area, the construction of the one-hour high-speed loop line has been accelerated. The T2 of Changchun Longjia International Airport was put into use. Huigong Road, Airport Avenue and Changyi Road were opened to traffic. The total mileage of roads has reached 27,800 kilometers. The highway network featuring “two rings and eight rays” has taken shape. The role of the modern metropolitan area as the pillar of the city has become more recognized with better services for the “six pairs”. 

        Over the past five years, more than 40 hospitals, 50 plus schools, over 20 parks, more than 100 water supply projects, more than 80 sewage treatment plants have been built or reconstructed in the city... 300 key projects related to people’s livelihood have further facilitated development, and improved the sense of gains and happiness of the public. 

        On March 25 this year, the construction of projects scheduled in Spring was launched at the construction site for the International Pharmaceutical Industrial Park of GenSci. 

        It’s 20 days earlier than that for the start of project construction in 2016! “The formalities in the early stage were handled very quickly. As soon as the site was ready for construction, we started without a day delayed,” said Lin Wei, Director of Public Affairs of GenSci. 

        Since the 13th Party Congress, Changchun has focused on project construction, with an all-out effort made to improve service capacity, optimize construction environment and made “good timing waits for projects” changed to “projects wait for good timing” due to which project preparation period is shortened and construction period is prolonged. 

        Improve system and prioritize coordination. Give full play to the role of “special teams for project construction” and project centers, study and issue the Managerial Measures for Key Projects in Changchun City, explore and implement the reform of “start construction with land acquisition approved” and “standard land plus commitment system”, adopt the method of “daily tracking, weekly scheduling and notification on a monthly basis”, and ensure in an all-round way the progress of project construction. 

        Ensure project construction and strengthen service quality. The role of overall planning at high level and high-profile coordination by leaders at municipal level was brought into full play. Wechat group established, the real-time connection between government officials at municipal level and heads of project units were made possible so as to solve the difficulties in project construction at the earliest possible time. 

        Strengthen research, judgment and stabilize investment. Increase investment, explore potential, strengthen research and prediction, and promote the steady growth of investment. Strengthen m research and judgment on a monthly basis, study and judge the investment trend of this month according to last month’s investment reports, find out tendentious and emerging problems as early as possible, amplify favorable factors while restrain adverse ones to stabilize investments within a reasonable range. Strengthen early warning and advance notice, give early timely warning temporary problems in investment growth and report to the municipal Party committee and government to strive to overcome the adverse effects of such factors as policy change, market fluctuation. 

        Take various measures and strive for the better. Changchun has taken active measures to seize the “window period” opportunities of national policies and complete the planning and application of special bond projects. Under the guidance of Changchun Municipal Commission of Development and Reform, 13 special teams each of which was composed of a deputy director general, a director and a staff member were established with multilevel and all-round counterpart services for project application. Special training meetings for special bonds of local governments were organized and professional services were provided for enterprise applicants so as to further improve the packaging, planning and application quality. 

        The Film and Television Industrial Park with a total investment of RMB1.171 billion has so far received a special debt support totaling RMB375 million. “The support we have obtained from the authorities including the development and reform commission and what’s been provided by others through Jingyue Hi-tech Industry Development Zone have served as supplements to the project construction funds we have and accelerated the process of project construction. The project has been completed 42% after more than a year of construction, and will soon become a new pole of growth of such industries as film, television, culture and tourism of Changchun City,” said Wang Jiafu, project investor and president of Changchun Jingyue Film, Television, Culture and Tourism Group Co., Ltd.